
All HV & LV electrical assets at Marcegaglia were inspected by our engineers. In addition to the electrical asset inspection, a comprehensive fixed wiring inspection was conducted at their UK facility.
Our engineers completed all fields of inspection in accordance with MET Group's policy of not using subcontracted labour.
By conducting both standard SFG20 inspections and energised inspections, compliance and reliability of the electrical infrastructure at this site will be ensured.
Comments