MET Group Power Systems Field Engineers Attend Amcor’s Site in Lombardy Italy for Data Acquisition of the HV & LV Infrastructure to allow our UK Design Team to begin the Arc Flash Study.
- MET GROUP MEDIA
- Jun 22
- 1 min read
Updated: Jun 25

The MET Group Power Systems team visited Amcor's site in Lombardy, Italy, to collect data on the High Voltage & Low Voltage installations.
The project is the largest Arc Flash Study to be carried in Europe reaching sixteen European countries that will run up to 2030 with ongoing support from our in-house design team.
We recently toured several locations in Italy and Germany while maintaining our operations in the UK. Our Power Systems and Energised Critical Inspection services will cover sixteen European countries.
The management team of MET Power Systems in the UK collaborated daily with the Amcor team in Italy and the global engineering team in North America. Each group was essential in creating an organised procedure for MET's engineers to execute the data acquisition process precisely, enabling MET's field engineers to detect any modifications to the existing infrastructure and electrical drawings.
Comments