MET Group Test from the Ground to the Clouds
A full inspection of the LV electrical infrastructure was carried at 22 Bishopgate London.
Along with our client BGIS FM the project & schedule was planned months in advance to maintain power at all times to one of the largest buildings in Europe while the LV distribution system was subjected to a real time under load analysis.
MET Groups services can be deployed to all your electrical assets any time of the day without any loss of power or planned isolation.
Comments