top of page
Writer's pictureMET GROUP MEDIA

MET Group Carry Out Air Circuit Breaker Maintenance & Secondary Injection Testing to Elean Power Station.



MET Group carried out maintenance & Secondary Injection testing to ABB & Schneider ACBs to one of the only power stations in the UK that produces power by burning straw from all over the UK.


The site generates 270 GWh of electricity annually and is one of the most interesting sites to attend and learn what is being achieved by the EPR Ely staff.

30 views0 comments

Comments


bottom of page