MET Group Technical Begin Electrical Testing at One of the Largest Manufacturing Estates in the UK for CBRE
- MET GROUP MEDIA
- Apr 9, 2024
- 1 min read
Updated: Jan 9

MET Group Technical begin electrical circuit testing at Airbus Chester for our valued client CBRE.
The estate is one of the largest in the UK with the works being carried out outside normal hours.
The health and safety expected from CBRE & Airbus is one of the most demanding in the industry we have seen but we are happy to say all areas were covered.
The installation and maintenance processes at this site is of an high standard and makes an inspection straight forward regardless of the estate size.
Comments